Major Construction Projects:
- Chiller Water Plants- Approximately 75,000 tons of chilled water production capacity at five separate plant sites.
- Thermal Energy Distribution- Recently completed half-mile 30 million dollar pipeline project to deliver hot water and chilled water service to the new Indianapolis International Airport's Midfield Terminal.
- Natural Gas Pipeline- Completed a 25-mile natural gas pipeline in Central Indiana in November 2005 to access affordable gas supplies from western U.S. and Canada.
Technical Experience
-
Onsite Utility Systems:
BHMM Energy Services operates a wide array of on site utility systems for our customers, including steam. hot water, chilled water, electric generation, compressed air, industrial gases, purified water, waste water treatment, building management, utility management, maintenance management, continuous emission monitoring, boiler control systems and SCADA systems. -
District Chilled Water Systems:
Citizens Thermal operates one of the nations's fastest growing district chilled water systems with more than 15 miles of piping connected to more than 30 large customers. Our 27 chillers currently can produce up to 75,000 tons of cooling. Annual chilled water sales total about 157 million ton hours. -
Natural Gas Distribution:
Citizens Gas provides natural gas to about 266,000 residential, commercial and industrial customers in the Indianapolis area. Citizens' gas system includes more than 4,000 miles of low-pressure gas distribution lines and more than 70 miles of high pressure gas transmission lines. Citizens operates an underground gas storage system with 7 Bcf capacity and two liquefied gas storage terminals with a combined 2 Bcf capacity